Page MenuHomePhabricator

[avalanche] Move the proof accessor tests to the peer manager tests
ClosedPublic

Authored by Fabien on Jul 12 2021, 13:04.

Details

Summary

The peer manager is responsible for the proof management, so this makes sense to test the proof accessors in its test suite.

Depends on D9766.

Test Plan
ninja check-avalanche

Diff Detail

Repository
rABC Bitcoin ABC
Branch
avalanche_move_proof_accessor_tests
Lint
Lint Passed
Unit
No Test Coverage
Build Status
Buildable 16154
Build 32181: Build Difflint-circular-dependencies · build-without-wallet · build-diff · build-debug · build-clang · build-clang-tidy
Build 32180: arc lint + arc unit